Penn-Delmar's DC Load Bank Testing verifies your entire battery system at 100% full load before it leaves our facility. The first time your backup power is tested under real conditions should not be a blackout.
Standard battery replacement projects carry a hidden assumption: the batteries you ordered will perform as rated when they are installed. That assumption is wrong often enough to matter.
Battery-level testing by manufacturers tells you that a battery has passed factory inspection. It does not tell you the system will hold the load when the lights go out. Most organizations discover a problem during installation — or after it — when downtime carries consequences.
The standard approach to on-site battery testing after installation also carries hidden costs: a UPS technician on site for each phase, extended project timelines, possible weather and facility delays, and the risk of stressing older UPS equipment by running load through it. In many cases, that equipment has never seen 100% load.
Every battery system Penn-Delmar installs is tested at full 100% load, as a complete system rather than individual cells, at Penn-Delmar's Nottingham, PA testing facility.
DC-to-DC. IEEE 1188-compliant. Documented. When your installation crew shows up, the batteries are verified.
Every battery. Tested at full system load. Documented and verified before it leaves Nottingham.
This client required replacing a large legacy battery system comprising hundreds of batteries at a critical facility. The primary client requirement was direct: minimize time on site. Prior vendors had proposed projects spanning four to five weeks, each requiring sequential on-site testing, a UPS technician present at every phase, and extended access to the facility floor.
Penn-Delmar pre-tested every battery at its Nottingham, PA facility before the installation crew left. Every battery arrived verified. No on-site testing. No UPS technician during installation. No per-system delays.
"Five weeks of project time, compressed to one."
"Penn-Delmar pre-tested every battery before our crew arrived on site. No UPS technician phases, no per-system delays, no extended floor access. The chain-of-custody documentation went straight into our compliance file. We've used them on every battery replacement since."
— Michael R., Director of Critical Facilities, Fortune 100 Data Center Operations
Every battery system Penn-Delmar installs goes through the same controlled, documented process before it reaches your facility. This is not an add-on service. It is how Penn-Delmar operates.
Will it actually work when it matters?
Your backup power system is not tested for the first time when your facility needs it. Every battery Penn-Delmar installs has been verified at 100% full load before it arrives on site. The question "will it work?" is answered before your crew shows up.
Can I prove the system was properly tested?
Testing certificates, software tracking records, and the option to witness every test at our facility with your batteries. When leadership, auditors, or warranty administrators ask whether the system was validated, you have an irrefutable answer — not a vendor's verbal assurance.
Will this extend my project timeline?
Projects that could take weeks under the standard on-site testing methodology are completed in days when batteries are pre-tested. No UPS technician standing by. No per-system delays. No extended facility access window.
Penn-Delmar works with facilities managing their first large-format battery replacement and with Fortune 100 technical committees that have run dozens of projects. The process is the same.
If your facility has its own installation crew, Penn-Delmar's facility is fully capable of testing and certifying the system without handling the installation. Contact Penn-Delmar to discuss the scope.
Telecom carriers, multi-facility operators, and Fortune 100 technical committees have used Penn-Delmar to standardize verification across dozens of project sites. The methodology does not change with scale.
If you are responsible for the integrity of backup power at a facility where failure is not an option — and you are planning a battery replacement in the next 12 months — you should understand what pre-installation full-load testing changes about your risk profile before you finalize your vendor selection.
Penn-Delmar Power has served Fortune 100 financial institutions and Department of Defense government entities for over 17 years. The company's direct-service model and pre-installation testing methodology are not marketing language. They are the operational standard Penn-Delmar has maintained on every engagement since the company was founded.
Penn-Delmar's 750kW DC load bank testing capability is not industry standard. It is intentionally scarce. One load bank. One facility. Penn-Delmar's own crew on every installation. That constraint is also a guarantee of consistency.
Penn-Delmar is the only independent company in the United States operating a 750kW DC load bank capable of verifying full battery systems at 100% load before installation.
Tim Hershey founded Penn-Delmar Power in 2008 with a clear premise: critical infrastructure facilities deserved a service partner that was technically capable, fully accountable, and not constrained by manufacturer allegiances. In the 17 years since, Penn-Delmar has grown into the only independent company in the United States operating a 750kW DC load bank capable of verifying full battery systems at 100% load before installation. That capability is the direct result of Tim's technical conviction that the standard approach to battery testing — manufacturer cell-level testing followed by post-install on-site verification — was inadequate for the risk exposure of Fortune 100 and government-class facilities.
24+ years of battery experience built on initial 6 as a technician in the field. He understands all the components you are looking for, and knows the questions to ask to fulfill your particular needs.
Edward Stein is a seasoned executive in the critical power and energy storage industry with more than 35 years of experience in battery technology, manufacturing, and power systems. As General Manager of Operations & Sales at Penn-Delmar Power, he leads business development, operations, project management, and national sales initiatives supporting the critical power sector. Prior to joining Penn-Delmar Power, Edward held leadership roles with EnerSys, Sure Power, and East Penn Manufacturing, where he developed extensive expertise in energy storage systems, manufacturing management, and business development. He holds a Bachelor of Science in Chemistry from Kutztown University of Pennsylvania.
Penn-Delmar operates one DC load bank. Testing capacity is capped at approximately 4,000 batteries per month. We are typically scheduled at least one month in advance. If you have a battery replacement project in your planning horizon, the time to schedule is before your installation timeline is finalized.
A member of Penn-Delmar's team will review your battery specifications, confirm testing capacity for your project timeline, and walk through the pre-installation testing process.
There is no obligation to proceed. There is no sales pressure. If pre-installation testing is not the right fit for your project, Penn-Delmar will tell you that directly.
Request a Load Test Assessment →